Practical guidance on interior design, fit-out, and project management for UAE offices, homes, and commercial spaces.

Delete the dining room and the hard half of a restaurant fit-out is all that is left. 2026 guide: AED 75K–100K pod vs AED 600–1,200/sqft shell, the three approval tracks, the DM Food Safety layout gate, 2026 DCD suppression spec, extraction and grease rules, and seven places budgets break.
Read More →
Three quotes for the same office, 40% apart. 2026 guide: why lump sums cannot be compared, the BOQ that makes them like-for-like, how provisional and prime cost sums are valued, the DM, DCD, Trakhees, NOC and DEWA lines a quote must name, 5–10% retention terms, and a step-by-step tender analysis sheet.
Read More →
Snag three times, not once. 2026 guide: the trade-by-trade snagging checklist, the handover document set, what the Taking Over Certificate triggers, 5–10% retention release, the 12-month DLP and the new Articles 821–824 decennial regime.
Read More →
A mezzanine is a structural building modification, not shelving. 2026 guide: DM, Trakhees and JAFZA jurisdiction, the 3 m clear-height rule, load ratings from 2.5 to 12 kN/m², AED 450–900 per m² build rates and the 15–30 day approval window.
Read More →
A fire door is a certified assembly, not a door. 2026 guide: ratings by location, BS 476 vs EN 1634-1 vs UL 10C, the 3 mm and 8 mm gap limits, AED 4,000–8,000 leaf costs and the seven failures that void a rating.
Read More →
The DCD inspector tests systems live, not on paper. 2026 guide: the AMC and Hassantuk gates that block the booking, AED 500–1,000 per visit, ~14-day slots, the document pack, and the seven failures that trigger a re-inspection cycle.
Read More →
MEP is 20–35% of a UAE fit-out budget and the biggest source of delay. 2026 guide: the sub-600 mm ceiling void, a 7-stage coordination sequence, DM, DCD and DEWA submissions, and what a clash costs by the stage it is found.
Read More →
Gypsum partitions in Dubai cost AED 80–220/m² supply-and-fix. 2026 guide: rates by system, board colour coding, stud centres, the fire ratings Civil Defence accepts, acoustic flanking paths and DM permit triggers.
Read More →
Which authority governs your unit, the documents every submission needs, DM permit at ~AED 1/sqft in 5–10 working days, parallel Civil Defence NOC, free zone routes and the five most common causes of rejection.
Read More →
Dubai apartment interior design costs AED 150–420/sqft. 2026 guide: cost tables by unit size, popular styles, OA NOC requirements and V Square’s fit-out process.
Read more →
Staircase renovation in Dubai villas costs AED 25,000–180,000+. 2026 guide: straight, floating and curved staircases, marble vs timber vs glass balustrade, Dubai Municipality code and V Square’s process.
Read more →
Curtains and window treatments in Dubai cost AED 80–450 per running metre installed. 2026 guide: sheer vs blackout, motorized tracks, UAE heat and fading, and V Square’s fitting process.
Read more →