Home / Blogs
Blogs

Design & delivery, explained

Practical guidance on interior design, fit-out, and project management for UAE offices, homes, and commercial spaces.

Office Acoustic Soundproofing Dubai
Guides · 27 Aug 2026

Office Acoustic Soundproofing Dubai

STC and Dw targets room by room, slab-to-slab detailing, ceiling baffles, sound masking and AED costs

Read More →
Dubai Municipality Fit Out Permit BPS
Guides · 27 Aug 2026

Dubai Municipality Fit Out Permit BPS

Get your Dubai Municipality fit-out permit via BPS portal with our step-by-step guide for tenants

Read More →
Server Room Fit-Out Dubai
Guides · 27 Aug 2026

Server Room Fit-Out Dubai

FM200 and Novec suppression, room integrity testing, CRAC sizing per rack and the DCD permit route

Read More →
Office Fit Out Cost Dubai Per Sq Ft
Guides · 26 Aug 2026

Office Fit Out Cost Dubai Per Sq Ft

Discover the average office fit out cost in Dubai per square foot for CAT A and CAT B pricing

Read More →
Glass partition cost Dubai 2026 — full-height glazed office partitions and a frameless glass balustrade in a commercial atrium
Fit-Out & Construction · 28 Aug 2026

Glass Partition Cost Dubai 2026: Types, Acoustic Ratings & Installation

The datasheet says Rw 52; the room measures 38. 2026 guide: AED 450–2,200/m² by system, why Dubai sets no legal STC minimum for a tenant fit-out, the four flanking paths that eat your rating, EI 60 tested-system rules and a worked 600 m² package.

Read More →
Raised Access Flooring Dubai
Guides · 26 Aug 2026

Raised Access Flooring Dubai

EN 12825 load classes, void depths, panel cores and what a raised floor really costs per square metre

Read More →
Bathroom Renovation Cost Dubai
Guides · 26 Aug 2026

Bathroom Renovation Cost Dubai

Get an estimate for your bathroom renovation in Dubai with our 2026 pricing guide

Read More →
Landlord NOC Dubai 2026 — diagram of the Dubai fit-out approval chain showing the landlord and building management NOC as the gate before the DM BPS, DDA or Trakhees permit
Approvals & Compliance · 26 Aug 2026

Landlord NOC Dubai 2026: Fit-Out Approval, Cost & Timeline

It approves nothing technically — and blocks everything. 2026 guide: who signs across five ownership models, the scope wording DM reviewers reject, the AED 500–2,500 fee and AED 5,000–20,000 refundable deposit, the 3–15 working day window, the contractor conditions buried in the small print and how the deposit comes back.

Read More →
Tenant improvement allowance Dubai 2026 — diagram splitting landlord base-build scope from tenant Category B fit-out scope, with the Article 15 completion-cost clause and Article 23 on fixed improvements
Approvals & Compliance · 25 Aug 2026

Tenant Improvement Allowance Dubai 2026: Fit-Out Cost Recovery

The cheque is rare, but the clause is statutory. 2026 guide: Article 15 requires the lease to name who pays for completion, Article 23 bars you removing fixed improvements, plus the four contribution structures, rent-free versus cash economics, drawdown traps and the reinstatement election that decides who really paid.

Read More →
HVAC modification Dubai fit out 2026 — centrifugal chillers, chilled water headers and insulated pipework in a district cooling plant room
Approvals & Compliance · 24 Aug 2026

HVAC Modification Dubai Fit Out 2026: Chiller and BTU Meter Rules

Three rulebooks govern it and the district cooling one is the expensive one. 2026 guide: DM heat load parameters and the 502.02 demand-control trigger on alterations, chiller minimum COP, fire damper ratings from Fire Code Chapter 10, the RD06 BTU meter clauses, low delta T charges and the one-time 10% capacity reduction.

Read More →
DEWA load upgrade cost Dubai 2026 — main distribution panel and switchgear in a commercial electrical room, the incomer and busbar a load increase has to re-rate
Approvals & Compliance · 24 Aug 2026

DEWA Load Upgrade Cost Dubai 2026: Fit-Out Power Requirements

There is no published tariff — the cost is a stack. 2026 guide: sanctioned load vs maximum demand, the DEWA feeder bands from 60 A/30 kW to 400 A/200 kW, the 400 kW substation line, the additional-load document set, 1–3 week timelines, and the diversity and power-factor errors that get applications returned.

Read More →
Veterinary clinic fit-out Dubai 2026 — consultation and examination room with a sealed wipeable treatment table, wall-mounted instrument shelving and a wall-hung paper dispenser
Healthcare Design · 23 Aug 2026

Veterinary Clinic Fit-Out Dubai 2026: Cost, Layout and Approvals

A vet clinic is not a small medical clinic. 2026 guide: AED 450–1,100/sqft by tier, the five authorities (DET, DM, MOCCAE, DCD and FANR), a room-by-room space programme, three-zone pressure ventilation, designing a ward for 90 dB, and the FANR shielding calculation that must come before the partitions.

Read More →